Saturday 29th April,

Cleared out all of the boxes from the study furniture to the tip, along with the old desk and chairs. The garage was now clear of crap after the study build. It was still a lot of space

Went to Ba Ngoi's and fixed her smoke alarm - but I couldn't fix the leaky tap, as I need to buy a new one. Struggled to shut the water off. 

Comments

Popular posts from this blog